Russells Hall
Project Description: Our first Project in the UK re-designing and installing 14 Operating Theatres. |
| |
|
|
 |
James Paget Hospital
Project Description: Re-organise the 8-bed ITU unit, with a specialist design to cater for the low ceilings. The left side of the picture shows the clinical management system, for monitoring and ventilation equipment. The right side shows the patient data management system workstation.
More details ........ |
| |
|
|
 |
Broadgreen Hospital, Liverpool Cardiothoracic Centre
Project Description: The new Critical Care Unit opened in the Autumn 2005, with pendant systems for 40 beds, 20 of these beds are also equipped with our IMEC System.
More details .................... |
| |
|
|
 |
Queens Hospital, Burton
Project Description: The Endoscopy Rooms were installed with pendants in early 2005, to ensure the existing room space was better utilised. Prior to pendant installation there were floor standing stacks of equipment. Therefore the new pendants contain 6-drawer units to create more storage space. |
| |
|
|
 |
New Cross Hospital
Project Description: Pendants installed in September 2004, 30-bed unit in CCU, HDU & Theatres. General view of bed space showing ventilator and dock-on trolley on right side with trent monitor mounted above, on a fully adjustable GCX arm. |
| |